References 2002

U.S.STEEL Košice s.r.o.

  • repairof sunken pit for pig iron on OCII. Continuous annealing line
  • adjustment of rails, dedusting of sintering bands

CONTINENTAL MATADOR s.r.o., Púchov

  • complete supply and assembly of steel structure

SL. LIEHOVARY ALIKÉRKY a.s. Leopoldov

  • installation of pipelines
  • Supply and assembly of steel structureon different floors and individual bridges, supply of tinsmith products, repair works

RANNILA s.r.o. Košice

  • Delivery of herringbone shelves

ISTROCHEM a.s., Bratislava

  • streamline the distribution of steam - Steam pipelines Sulfenax

ŽELEZIARNE PODBREZOVÁ a.s.

  • reconstruction and regeneration of HCl acid
  • locksmith work

TOWER AUTOMOTIVE Malacky

  • Complete supply and assembly ofsteel structures  sheds 1, 2, 3, including project documentation

OFZ a.s. Istebne ReMo EOP 24

  • Hydraulics

KBS Kremnica s.r.o.

  • Bentonite tray

DZ Blast Furnaces

  • MO, BO and SO VP 3 and VP 2
  • fitting, welding and incendiary work on VP 2 and VP 3
  • Repair of steel constructions, lines at DZ VP
  • Repair of a vertical sliding gate drive
  • Casing road bridges
  • Repair of metal roofs at casthouse VP 2
  • Repair of steel construction and installation of bucket-chain N3
  • SP SO no. 1
  • dedusting of sintering bands no. 4, 1, 2, 3
  • repair of conveyors S504, S505
  • removal and installation of the cooling belt no. 1
  • Exchange of techno grids - Tunnel of the feed belt 20 PL, 33.34

DZ Coke plant

  • fitting, welding and incendiary works small and standart repairs
  • Scattered repairs to the ceiling, suction risers on CB3
  • fitting, welding and incendiary workC and CB3
  • Repair of quenching car no. 3 on VKB1
  • standard repairs  of turbo compressor
  • Changing of filter no. 4
  • standard repairs at Cold road no. 2
  • Repair of ammonia choke no. 1 at DV Chemistry
  • Repair the master ammonia chokes. 1, 2, 3, 4, 5
  • Locksmith work on the cooling end no. 3
  • repair at gaspiping siphon and leak No. 1,2,3,4,5

DZ Steelworks I. and II.

  • Repair and relocation of staircase to the platform desulfurization equipment OK OCI
  • Repairs to the OC I
  • fitting, welding and incendiary work at DZ OC OC I and II
  • fitting, welding and incendiary work at repairing the ZPO II
  • repair and replacement of damaged parts of the beam at platform  K-5

DZ Hot Rolling Mill

  • fitting, welding and incendiary work - small and standard repairs
  • sampling and end-control line
  • Replacement disc filter trough no. 3
  • fitting, welding and incendiary work - small and standard repairs

DZ Cold Rolling Mill

  • Repair  of galvanizing line
  • Fix fans and stands on the annealing plant
  • fitting, welding and incendiary work on the annealing plant no. 2 and 3
  • Repair of aggregates at the annealing plant
  • Repair ML no. 1
  • Repair DN no. 1

DZ Hutnícka druhovýroba

  • Production of spirally welded pipes 18 m - Reconstruction of mechanical Beveller
  • ultrasound control