References 2002
U.S.STEEL Košice s.r.o.
- repairof sunken pit for pig iron on OCII. Continuous annealing line
- adjustment of rails, dedusting of sintering bands
CONTINENTAL MATADOR s.r.o., Púchov
- complete supply and assembly of steel structure
SL. LIEHOVARY ALIKÉRKY a.s. Leopoldov
- installation of pipelines
- Supply and assembly of steel structureon different floors and individual bridges, supply of tinsmith products, repair works
RANNILA s.r.o. Košice
- Delivery of herringbone shelves
ISTROCHEM a.s., Bratislava
- streamline the distribution of steam - Steam pipelines Sulfenax
ŽELEZIARNE PODBREZOVÁ a.s.
- reconstruction and regeneration of HCl acid
- locksmith work
TOWER AUTOMOTIVE Malacky
- Complete supply and assembly ofsteel structures sheds 1, 2, 3, including project documentation
OFZ a.s. Istebne ReMo EOP 24
- Hydraulics
KBS Kremnica s.r.o.
- Bentonite tray
DZ Blast Furnaces
- MO, BO and SO VP 3 and VP 2
- fitting, welding and incendiary work on VP 2 and VP 3
- Repair of steel constructions, lines at DZ VP
- Repair of a vertical sliding gate drive
- Casing road bridges
- Repair of metal roofs at casthouse VP 2
- Repair of steel construction and installation of bucket-chain N3
- SP SO no. 1
- dedusting of sintering bands no. 4, 1, 2, 3
- repair of conveyors S504, S505
- removal and installation of the cooling belt no. 1
- Exchange of techno grids - Tunnel of the feed belt 20 PL, 33.34
DZ Coke plant
- fitting, welding and incendiary works small and standart repairs
- Scattered repairs to the ceiling, suction risers on CB3
- fitting, welding and incendiary workC and CB3
- Repair of quenching car no. 3 on VKB1
- standard repairs of turbo compressor
- Changing of filter no. 4
- standard repairs at Cold road no. 2
- Repair of ammonia choke no. 1 at DV Chemistry
- Repair the master ammonia chokes. 1, 2, 3, 4, 5
- Locksmith work on the cooling end no. 3
- repair at gaspiping siphon and leak No. 1,2,3,4,5
DZ Steelworks I. and II.
- Repair and relocation of staircase to the platform desulfurization equipment OK OCI
- Repairs to the OC I
- fitting, welding and incendiary work at DZ OC OC I and II
- fitting, welding and incendiary work at repairing the ZPO II
- repair and replacement of damaged parts of the beam at platform K-5
DZ Hot Rolling Mill
- fitting, welding and incendiary work - small and standard repairs
- sampling and end-control line
- Replacement disc filter trough no. 3
- fitting, welding and incendiary work - small and standard repairs
DZ Cold Rolling Mill
- Repair of galvanizing line
- Fix fans and stands on the annealing plant
- fitting, welding and incendiary work on the annealing plant no. 2 and 3
- Repair of aggregates at the annealing plant
- Repair ML no. 1
- Repair DN no. 1
DZ Hutnícka druhovýroba
- Production of spirally welded pipes 18 m - Reconstruction of mechanical Beveller
- ultrasound control